Category Archives: Case Studies

Compass Energy was tasked to provide our engineering expertise for the conversion of the LNG Lucky and Fortune ex. Tenaga Tiga and Tenaga Dua to LNG-FSU’s in various engineering and design work. These included analysis, equipment sourcing, system upgrade feasibility studies and design.
Challenge

Compass Energy was tasked to provide our engineering expertise in various engineering and design works. These included analysis, equipment sourcing , system upgrade feasibility studies and design.

Scope

A series of engineering and design works were executed. These included analysis of pipe reel cradle, design of stern fenders, reel bumpers, anti heeling system, stress analysis of structures, naval architecture and calculation of the pipe lay vessels, technical writing and equipment sourcing and recommendation.

Benefit

All design and engineering works were carried out utilizing regular coordination meetings with client. This ensures an optimal fit for purpose solution which is well accepted by the ship crews. All engineering deliverables were completed and submitted on schedule.

Challenge

Compass Energy was commissioned to provide a turnkey solution for two units of Dehumidifier Containers. The completed product shall be installed on FSO Gagak Rimang. This is a fast paced project and the management of the schedule of the project is of utmost importance.

Scope

Compass Energy was tasked to design two units of Dehumidifier Containers, procure the necessary equipment and fabricate the entire structure. All required drawings were submitted to Class and approved. Project management were evidenced in different phases of the job scope namely from engineering, construction and testing to delivery.

Benefit

The project was completed on time and was of the highest standard despite the tight time frame given. All tests were conducted successfully and the final product was delivered on schedule.

Challenge

To ensure timely delivery of vessel built with an emphasized standard for quality. Completion of the challenge involved efficient and timely team work and communication between client, site team and fabricators.

Scope

Compass Energy was requested by BAM International to provide a team of superintendents to act as their representatives during the construction of a Civil Construction Jack Up Barge. The vessel was constructed in a shipyard located in China.

Benefit

With organized and efficient planning and management, the vessel was constructed on schedule and delivered on time for its maiden project in Australia.

Challenge

The four units of OSVs are to be delivered on schedule with the highest of standards. Construction of the OSVs took place at a shipyard located in China.

Scope

Compass Energy provide its expertise in assisting the client in the daily site inspection and review of engineering documents from the shipyard.

Benefit

The vessels were progressively commissioned and delivered as scheduled. The vessels are now in operation and they are built to the standard specified.